Boston Sword and Tuna

22 Drydock Avenue, Boston

Boston Sword and Tuna

About This Project

New construction of a 2-story, FDA-certified, seafood processing plant and headquarters. The building includes processing areas, loading docks, conditioned storage areas, and office space. The processing areas feature structural steel and 4-6 insulated metal panels for refrigeration properties. The office features large curtain walls for beautiful views of Downtown Boston and Logan Airport. 91Ö±²¥ worked closely with subcontractors to coordinate the unique MEP systems into an efficient, cost-effective loop that provides flexibility for equipment adaptations in the future.

Project Specifications

  • 50,000 SF
  • 15-month schedule
  • Heavy utilization of BIM modelling in conjunction with the subcontractors to accommodate consistent changes in processing equipment
  • Unique MEP systems including refrigeration infrastructure, ozone, compressed air, and high-pressure soap systems
  • Contains a flash freezer, live lobster tanks, sanitation systems, and conditioned shipping areas

Other projects in Commercial